Siemens ET 757 E Series Betriebsanleitung Seite 77

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 190
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 76
ET 200pro FC
Operating Instructions, 11/2007, A5E01100763B AA
77
Commissioning (hardware)
6
Introduction
Hardware commissioning involves the ET 200pro station and the drive components.
The following procedure describes by way of example the commissioning of a minimum
configuration on PROFIBUS DP, with an S7 controller as the master and STARTER software
directly on the optical interface of the frequency converter.
It is assumed that the user has the necessary knowledge of STARTER to create a drive
configuration and to use the operating panel.
Preconditions
Table 6-1 Preconditions for commissioning
Actions Reference
ET 200pro is mounted Chap.
Assembling
PROFIBUS address is set on interface module and IM is
wired
Interface module manual
ET 200pro is configured Chap.
Planning/Configuring
Motor is connected Chap.
Assembling
Power supply to the DP master is ON Manual for the DP master
The DP master is set to RUN mode Manual for the DP master
Seitenansicht 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 189 190

Kommentare zu diesen Handbüchern

Keine Kommentare