Site Planning GuideSPARC® Enterprise M8000 / M9000 Servers English
viii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008
3-22 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083.4.2.2 Blockade Character of Circuit BreakerThe blockade character of
Chapter 3 Environmental and Electrical Specifications 3-233.4.3 GroundingGrounding for Single-phase Power SupplySPARC Enterprise M8000/M9000 serve
3-24 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008
Abbreviations-1CHAPTERAbbreviationsAACS AC SectionACSTPH ACS Three-PhaseBBP BackplaneBUI Browser User InterfaceCCMB CPU Memory BoardCMU CPU/Memo
Abbreviations-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008PPCICS PCI CassettePCI-ES PCI-Express ShortPFC Power Fact
Index-1IndexAAccess route, 1-2planning, 1-31Air conditioningfloor openings, 1-29requirements, 3-8underfloor, 1-29CCabinetstabilization, 1-
Index-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008IInstallation specifications, 1-5MM8000appearance, 1-7floor openings
Index-3signal cables, 2-7signal line configuration, 2-8VVentilationunderfloor, 3-3Vibrationrequirements, 3-4XXSCF configurationbasic, 2-4maximum,
Index-4 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008
ixFiguresFIGURE 1-1 SPARC Enterprise M8000 Server 1–7FIGURE 1-2 SPARC Enterprise M8000 Server + Power Cabinet 1–8FIGURE 1-3 SPARC Enterprise M9000
Herausgegeben von / Published byFujitsu Siemens Computers GmbH*U41685-J-Z816-3-76 *U41685-J-Z816-3-76 Bestell-Nr./ Order No.:U41685-J-Z816-3-76
x SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008 FIGURE 1-18 SPARC Enterprise M8000 Server + Power Cabinet Footprint 1–24
xiTablesTA BLE 1-1 Checklist 1–1TA BLE 1-2 Names and Quantities 1–4TA BLE 1-3 Installation Specifications (External Dimensions and Weights) 1–
xii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008
xiiiPrefaceThe SPARC® Enterprise M8000/M9000 Servers Site Planning Guide provides the physical system specifications for this type of server, gives
xiv SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Structure and Contents of This ManualThis manual is organized as described
Preface xvNote – “x” in the order number is the version number of the manual.1. Manuals on the WebThe latest versions of all the SPARC Enterprise Ser
xvi SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083. Solaris Operating System Related Manualshttp://docs.sun.comText Conven
Preface xviiPrompt NotationsThe following prompt notations are used in this manual.Syntax of the Command Line Interface (CLI)The command syntax is as
xviii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Environment Requirements for Using This ProductThis product is a compute
Preface xixConventions for Alert MessagesThis manual uses the following conventions to show alert messages, which are intended to prevent injury to t
xx SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Notes on SafetyImportant Alert MessagesThis manual provides the following i
Preface xxiCaution – The CAUTION signal indicates a hazardous situation could result in minor or moderate personal injury if the user does not perfor
xxii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Normal operationData destructionConfirm the items listed below before tur
Preface xxiiiAlert LabelsThe labels shown below are affixed on this product. These labels provide information for users of the product:Caution – Do
xxiv SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008SPARC Enterprise M9000 Server (Front View)
Preface xxvSPARC Enterprise M9000 Server (Rear View)
xxvi SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Product HandlingMaintenanceCaution – Certain tasks in this manual should
Preface xxvii Plugging or unplugging of external interface cards Maintenance and inspections (repairing, and regular diagnosis and maintenance)Caut
SPARC® Enterprise M8000/M9000 Servers Site Planning Guide Order No. U41685-J-Z816-3-76 Part No. 819-7885-12April 2008, Revision A
xxviii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Fujitsu Siemens Computers Welcomes Your CommentsWe would appreciate you
Preface xxixReader's Comment Form
xxx SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FOLD AND TAPEFOLD AND TAPEBUSINESS REPLY MAILFIRST-CLASS MAIL PERMIT NO 7
1-1CHAPTER1Physical SpecificationThis chapter describes what the reader is expected to know, including physical specification for the SPARC® Enterpris
1-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Physical specifications Has the server installation location been decide
Chapter 1 Physical Specification 1-3Facility power Do you know the required operating voltages and electrical current levels of the device and per
1-4 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20081.2 Physical SpecificationsThis section outlines the SPARC Enterprise M8
Chapter 1 Physical Specification 1-51.2.1.2 External Dimensions and WeightsTABLE 1-3 lists the external dimensions and weights of the SPARC Enterp
1-6 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008M9000 (base cabinet + expansion cabinet) + Power Cabinet 2282 (89.8) 126
Chapter 1 Physical Specification 1-71.2.1.3 System AppearanceFIGURE 1-1 to FIGURE 1-6 show the appearance of the server components and the associa
PleaseRecycleCopyright 2007-2008 FUJITSU LIMITED, 1-1, Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken 211-8588, Japan. All rights reser
1-8 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-2 SPARC Enterprise M8000 Server + Power CabinetFront Rear
Chapter 1 Physical Specification 1-9SPARC Enterprise M9000 Server AppearanceFIGURE 1-3 SPARC Enterprise M9000 Server (Base Cabinet)Front Rear
1-10 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-4 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cab
Chapter 1 Physical Specification 1-11FIGURE 1-5 SPARC Enterprise M9000 Server (Base Cabinet + Power Cabinet)FrontRear
1-12 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-6 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cab
Chapter 1 Physical Specification 1-131.2.2 System Installation (Space)1.2.2.1 Size and Space SpecificationsBefore starting to assemble a SPARC Enter
1-14 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-8 SPARC Enterprise M8000 Server + Power Cabinet Installation
Chapter 1 Physical Specification 1-15FIGURE 1-9 SPARC Enterprise M8000 Server (With an Equipment Rack) Installation Area2860 (112.6)1260 (49.6)800
1-16 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-10 SPARC Enterprise M8000 Server (With an Equipment Rack) + P
Chapter 1 Physical Specification 1-17FIGURE 1-11 SPARC Enterprise M8000 Server (With an Equipment Rack) Installation AreaM8000Service areaService a
Copyright 2007-2008 FUJITSU LIMITED, 1-1, Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken 211-8588, Japon. Tous droits réservés.Entrée e
1-18 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-12 SPARC Enterprise M8000 Server (With an Equipment Rack) + P
Chapter 1 Physical Specification 1-19SPARC Enterprise M9000 Server Installation AreaFIGURE 1-13 SPARC Enterprise M9000 Server (Base Cabinet) Instal
1-20 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-14 SPARC Enterprise M9000 Server (Base Cabinet) + Power Cabin
Chapter 1 Physical Specification 1-21FIGURE 1-15 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet) Installation AreaService areaServ
1-22 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-16 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Ca
Chapter 1 Physical Specification 1-231.2.2.2 Footprints of the ComponentsFIGURE 1-17 to FIGURE 1-22 show the bottom of the SPARC Enterprise M8000/M9
1-24 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-18 SPARC Enterprise M8000 Server + Power Cabinet FootprintUni
Chapter 1 Physical Specification 1-25SPARC Enterprise M9000 Server FootprintFIGURE 1-19 SPARC Enterprise M9000 Server (Base Cabinet) FootprintUnit:
1-26 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-20 SPARC Enterprise M9000 Server (Base Cabinet) + Power Cabin
Chapter 1 Physical Specification 1-27FIGURE 1-21 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet) FootprintUnit: mm (inch)FrontCas
1-28 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-22 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Ca
Chapter 1 Physical Specification 1-291.2.2.3 Free-Access Floor Openings for Underfloor Air-ConditioningUse underfloor air conditioning to cool the S
1-30 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 1-24 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Ca
Chapter 1 Physical Specification 1-311.2.3 Planning Your Access RouteThis section describes necessary considerations before you move the server to i
1-32 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20081.2.3.2 Other ConsiderationsConfirm that the access route is free of an
Chapter 1 Physical Specification 1-33Method of Securing the Device to the Floor Surface(Example of securing the SPARC Enterprise M9000 server in pla
1-34 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Method of Securing the Device Through a Hole in the FloorFIGURE 1-26 C
2-1CHAPTER2Network Connection SpecificationsThis chapter describes the network connection specifications of the SPARC Enterprise M8000/M9000 servers.
2-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008FIGURE 2-1 SPARC Enterprise M8000/M9000 Server Connection Schematic Dia
Chapter 2 Network Connection Specifications 2-32.1.2 Platform and Domain Setup InformationThe following information is required for installation o
vContentsPreface xiii1. Physical Specification 1–11.1 Before Setting Up the System 1–11.2 Physical Specifications 1–41.2.1 System Components 1–
2-4 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008XSCF Configuration A (Basic Configuration)Only one of the two LAN ports
Chapter 2 Network Connection Specifications 2-5XSCF Configuration B (Restricted Configuration)(Restricted redundancy) - Both LAN ports are used. O
2-6 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008XSCF Configuration C (Maximum Configuration)(Maximum redundancy) - Both
Chapter 2 Network Connection Specifications 2-72.2 UPS InterfaceThis section describes the Uninterruptible Power Supply (UPS) interface which conn
2-8 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20082.2.3 Signal Line ConfigurationThis section describes signal definitions
Chapter 2 Network Connection Specifications 2-9ON: Indicates contacts are closedOFF: Indicates contacts are openNote1: Use a UPS capable of norma
2-10 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20082.2.3.2 Electrical SpecificationsTABLE 2-2 and TABLE 2-3 list the elect
Chapter 2 Network Connection Specifications 2-112.2.4 Cable ConnectorThe interface cable has the following specifications. Connector typeD-SUB9 p
2-12 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008
3-1CHAPTER3Environmental and Electrical SpecificationsThis chapter explains environmental and electrical power supply specifications and conditions ne
vi SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20082. Network Connection Specifications 2–12.1 Planning Your Network Connec
3-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083.1.2 Recommended Ambient Temperature and HumidityKeep the temperature i
Chapter 3 Environmental and Electrical Specifications 3-3according to the monitoring data at individual points corresponding to multiple exhaust v
3-4 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083.1.3 Vibration RequirementsThe allowable vibrations in the SPARC Enterp
Chapter 3 Environmental and Electrical Specifications 3-53.2.1 Single-Phase Power SuppliesTABLE 3-4 Specifications (Single-Phase Power Requiremen
3-6 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Power Cabinet SPARC Enterprise M9000 server (base cabinet + expansion ca
Chapter 3 Environmental and Electrical Specifications 3-73.2.2 Three-Phase Delta Power SuppliesTABLE 3-5 Specifications (Three-Phase Delta Power
3-8 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083.2.3 Three-Phase Star Power Supplies3.3 Cooling Specifications3.3.1 Coo
Chapter 3 Environmental and Electrical Specifications 3-93.3.2 Airflow and Heat DissipationSince the SPARC Enterprise M8000/M9000 server is design
3-10 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008 The SPARC Enterprise M9000 server uses internal fans in the base cabi
Chapter 3 Environmental and Electrical Specifications 3-11FIGURE 3-2 Cooling Air and Exhaust Flows of SPARC Enterprise M9000 Server The Power Ca
Contents vii3.4.1.3 Three-Phase Power Supply 3–173.4.1.4 Three-Phase Star Power Supply 3–193.4.2 Circuit Breaker Capacity and Characteristics 3–21
3-12 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083.4 Facility Power RequirementsThis section describes the power supply
Chapter 3 Environmental and Electrical Specifications 3-13Note – To connect power cables for this system directly to your power distribution board
3-14 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 20083.4.1.2 Power Cable Connection SpecificationsTABLE 3-8 lists specificat
Chapter 3 Environmental and Electrical Specifications 3-15SPARC Enterprise M9000 serverJapan 3.0m (9.8 feet)30A-250V 3P, locking type (NEMA L6-30
3-16 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008SPARC Enterprise M9000 serverEurope 3.0m (9.8 feet)EN60309 (32A) (Base
Chapter 3 Environmental and Electrical Specifications 3-173.4.1.3 Three-Phase Power SupplyFIGURE 3-6 Three-Phase Delta Power Supply ConnectionsNo
3-18 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Power Cable Connection SpecificationsPart of the local electrical work
Chapter 3 Environmental and Electrical Specifications 3-193.4.1.4 Three-Phase Star Power SupplyFIGURE 3-8 Three-Phase Star Power Supply Connectio
3-20 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008Power Cable Connection SpecificationsPart of the local electrical work
Chapter 3 Environmental and Electrical Specifications 3-213.4.2 Circuit Breaker Capacity and CharacteristicsAs a condition for maintaining the lin