
Siemens APOGEE™ FLN (P1) Communication Kit
MN04008002E
For more information visit:
www.EatonElectrical.com
3-7
February 2006
Table 3-4: Installing the OPTCB Communication Board, continued
Procedure Illustration
4. Make a sufficiently wide opening for your cable by cutting
the cover grid as wide as necessary.
5. Close the cover of the control unit and the cable cover.
Kommentare zu diesen Handbüchern