Siemens 270 series Betriebsanleitung Seite 57

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 274
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 56
Installation and connection
4.4 Switch on and test the HMI device
TP 270, OP 270, MP 270B (WinCC flexible)
Operating Instructions, Edition 03/2004, 6AV6691-1DD01-0AB0
4-19
Function test
Initiate a function test following commissioning. The HMI device is functional when one of the
following conditions occurs:
The "Transfer" dialog is displayed
The loader is displayed
A project is started
Switching off the HMI device
Switch off the HMI device in the following ways:
Switch off the power supply, or
Unplug the terminal strip from the HMI device
Note
If a project is already running on the HMI device, runtime must be terminated before
switching the HMI device off.
Use the operating element provided by the project engineer.
Seitenansicht 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 273 274

Kommentare zu diesen Handbüchern

Keine Kommentare