Procedure
To commission the transmitter for gases, proceed as follows:
1.
Open the shut-off valve for the test connection ④.
2. Via the test connection of the shut-off fitting ②, apply the pressure corresponding to the
start of scale value to the pressure transmitter ①.
3. Check the start of scale value.
4. If the start of scale value differs from the value desired, correct it.
5. Close the shut-off valve for the test connection ④.
6. Open the shut-off valve ⑥ at the pressure tapping point.
7. Open the shut-off valve for the process ③.
9.3.2 Commissioning with steam or liquid
① Pressure transmitter
② Shut-off fitting
③ Shut-off valve to process
④ Shut-off valve for test connection or for bleed screw
⑤ Pressure line
⑥ Shut-off valve
⑦ Blow-out valve
⑧ Compensation vessel (steam only)
Figure 9-1 Measuring steam
Commissioning
9.3 gauge pressure, absolute pressure from the differential pressure series and absolute pressure from the gauge
pressure series
SITRANS P, DS III series with HART
152 Operating Instructions, 09/2012, A5E00047092-08
Kommentare zu diesen Handbüchern