
Simple example
2.5 Test program
STEP 7 Basic V10.5
Getting Started, 12/2009, A5E02651459-01
53
Result
You have loaded the program to the PLC. The status of the program components is shown
in the project tree. The green icons indicate that the "offline" and "online" program elements
are identical. You will find the meaning of the additional status icons in the respective tooltip.
Note
Downloading blocks
Loading the blocks from the project tree is not the only way to transfer the blocks to the PLC.
You can use drag-and-drop to store the blocks in the list of accessible devices in the project
tree. If you use the button "Load to device" in the toolbar, you will load those blocks that are
open in the editor or that you have selected in the project tree.
Additional information
Information on establishing and configuring the Ethernet connection is available in the
following documentation:
● "SIMATIC S7-1200 Automation System" system manual
● TIA Portal information system, "Setting parameters for the Ethernet interface" chapter
● TIA Portal information system, "Configuring Industrial Ethernet" chapter
Information on establishing the Ethernet interface on the programming device / PC is
available in the documentation of the operating system you are using and in the
documentation of the network card.
Kommentare zu diesen Handbüchern