Siemens SIMATIC TI500 Spezifikationen Seite 269

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 322
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 268
Upgrading Existing Series 500 Installations
C-10
SIMATIC 545/555/575 System Manual
Upgrading an RF-Based 560/560T/565/565P System (continued)
To upgrade an existing 560, 560T, 565, or 565P system to a 575 system, you
need to replace the existing programmable controller, including its chassis,
power supply and all installed boards, with the VMEbus base, power supply,
and 575 CPU. You must also install a Series 505 base with an RS-485/RF
I/O channel converter (PPX:5056860) within three feet of the VMEbus
base, and ensure that the bases are electrically bonded (i.e., connected by a
grounding strap). The upgrade is shown graphically in Figure C-4.
NOTE: The 575 cannot directly replace a hot backup (HBU) configuration.
1. If the Series 500 remote I/O installation consists of more than one
coaxial (RF) remote I/O channel, combine these channels into a single
remote I/O channel. Refer to the chapter entitled Cabling and Wiring
the System, in the SIMATIC 560T/565T System Manual, for
information about installation of a coaxial remote I/O channel.
If the existing Series 500 system has more than 15 bases, multiple
VME 575 CPUs, each with its own I/O channel, can be used. However,
significant program modifications may be necessary in order to divide
the 565 program and redistribute the program among multiple 575
CPUs. Another option is to rewire, using a PROFIBUS-DP channel
with up to 112 master and slave devices.
2. Renumber your bases so that no two bases have the same number and
so that base number 0 is not used.
3. Modify the controllers I/O configuration to reflect the channel number
and base number changes.
4. Move jumper E8 on the 5752126 annex card from the U position to
the T position. This ensures that the I/O channel data lines are
properly terminated.
5. Install a Series 505 base with power supply and PPX:5056860
converter, as described in Section C.6.
6. Connect the RS-485 I/O port on the 575 CPU to the RS-485 I/O port on
the PPX:5056860 converter, and ensure that the VMEbus base is
electrically bonded to the Series 505 base, as described in Section C.6.
7. Connect the RF (coaxial) cable of the Series 500 I/O channel to the
PPX:5056860 port that is labeled RF To I/O BASES. (See Section C.6.)
Upgrading an
RF-based System
to 575
Seitenansicht 268
1 2 ... 264 265 266 267 268 269 270 271 272 273 274 ... 321 322

Kommentare zu diesen Handbüchern

Keine Kommentare